
Licensing
Masters License Electrical (2026): Master Electrician License Requirements by State
States that issue a master electrician license set very different bars. Texas asks for a Journeyman license held two years and 12,000 hours of training, Iowa one year as a licensed journeyman, Montana four years and Maryland seven. North Carolina, Georgia, Florida and Arizona license the electrical contractor instead (official sources, checked November 10, 2026).
Summary of official sources for orientation, not legal advice. Each state board always has the final word.
ByEdu López Parada· Founder, Made For BuildersReviewed
Summary
Master electrician license requirements by state
A master electrician license is a personal license for planning and supervising electrical work, and in several states the electrical contracting business rests on one. Where it exists, it sits above the journeyman license and requires journeyman experience plus an exam. In four of our five markets, the state sources we read license the contracting business instead.
| State | Regulator | State license | Experience to qualify | Exam | Fees and continuing education |
|---|---|---|---|---|---|
| Texas | TDLR | Master Electrician | Journeyman license held at least two years and 12,000 hours of on-the-job training under a Texas Master | PSI, open book | $45 to apply, $45 to renew each year; 4 hours of CE before each renewal |
| Iowa | Electrical Examining Board (DIAL) | Master Electrician, Class A | At least one year as a licensed journeyman electrician | Score of 70 or higher | $375 for 3 years; 18 contact hours of CE per 3-year period |
| Montana | State Electrical Board | Master Electrician | Four years of licensed journeyman experience | PSI, open book, 75% or higher | Sixteen hours of NEC education per renewal |
| Maryland | State Board of Electricians | Master electrician | At least seven years under a Maryland licensed master electrician (up to three years of credit for formal study) | Yes, application through PSI | See the board's fee page |
| North Carolina | NCBEEC | Electrical contractor license held by a qualified individual (Limited, Intermediate, Unlimited) | Varies by classification | 100 questions, 6 hours (Limited, Intermediate, Unlimited) | Unlimited: $200 a year; 8 hours of CE a year |
| Georgia | Rules ch. 121-3 (secondary source: Cornell LII copy) | Electrical Contractor, Class I or Class II | At least 4 years of primary experience; age 21 or older | Score of 70 or higher | Not stated in the rule |
| Florida | Electrical Contractors' Licensing Board | Certified electrical contractor (statewide); journeyman licenses are local | At least 4 years as a supervisor or contractor in the trade (one of several routes) | Certification examination | Not covered here |
| Arizona | Registrar of Contractors | Contractor license through a qualifying party | Four years' practical or management trade experience, two of them within the last ten years | Written exam taken not more than two years before applying, if required | Not covered here |
Requirements change
Boards change hours, fees and exam rules between our checks, and cities can add their own licenses. Confirm every requirement with the state board before you apply.
Business vs personal
Do you need a master license to run an electrical business?
In Texas and Iowa, yes, or you must employ someone who has one: the electrical contractor license rests on a master electrician. In North Carolina, Georgia, Florida and Arizona the state licenses the contracting business through a qualified individual or qualifying party, without a separate master electrician license at state level.
- Texas: you must employ a licensed Master Electrician to apply for an Electrical Contractor license, and the Master may also be the business owner. A Master may be assigned to only one contractor unless he owns more than 50 percent of it.
- Iowa: an Electrical Contractor either is licensed as a Master A or B Electrician or employs one. Iowa Code section 103.8 lets only a contractor or a Class A or B master plan, lay out or supervise electrical installations for another person.
- Montana: a master licensee must be the responsible electrician for an unlimited electrical contractor.
- North Carolina: the qualified individual is the qualified person holding the electrical license, and each place of business needs at least one listed qualified individual regularly on active duty.
- Florida and Arizona: a Florida certified electrical contractor holds a geographically unlimited certificate of competency issued by the department; Arizona's registrar of contractors issues contractor licenses after a qualifying party meets the experience and exam rules.
How the business layer and the crew layer fit together, with the qualifier rules owners need, is covered in electrical license: what the business needs vs what your electricians need. The contractor licenses for each state are compared in the electrical contractors license guide.
Steps
Steps to get a master electrician license
The route is the same shape everywhere it exists: log journeyman experience, get it signed off, apply to the board, sit the exam once approved, then keep the license with renewals and continuing education. The BLS notes that most electricians first learn the trade in a 4- or 5-year apprenticeship program.
Experience and exam
Document every hour. In Texas, each supervisor signs an Experience Verification Form, and Journeyman Industrial Electrician experience may not be used to qualify for a Master license; a municipal or regional master license holder may verify his own hours. Texas exams are given through PSI and are open book. Iowa requires a score of 70 or higher, Montana 75% or higher.
Insurance and bond
A master license on its own is a personal license. Insurance and bonds attach to the contracting business: for example, a Texas Electrical Contractor needs liability insurance of at least $300,000 per occurrence, and North Carolina requires a statement of bonding ability to activate Intermediate and Unlimited licenses. Each state's figures are in the electrical contractors license guide.
Business registration
If you plan to run your own shop with your master license, the SBA says to choose a business structure before you register your business with the state, and the IRS issues an EIN online, in minutes and for free. Then apply for the contractor license that rests on your master license.

State by state
State notes: the five Partner Program markets and other states
Texas has the clearest master ladder of our five markets. North Carolina, Georgia, Florida and Arizona each put the weight on the contractor license. Iowa, Montana and Maryland show how far master requirements can differ: from one year as a licensed journeyman to seven years under a master.
- Texas: a Master Electrician is licensed to install, maintain or extend an electrical wiring system. Licenses are valid for one year and renew annually. Full detail in the Texas electrical license guide.
- North Carolina: the Unlimited license allows any electrical contracting project regardless of value, at $200 a year. NCBEEC says experience requirements to sit for the exam vary by classification.
- Georgia: Class I Electrical Contractor licenses are restricted to single-phase installations that do not exceed 200 amperes; Class II licenses are unrestricted (secondary source: Cornell LII copy of Ga. Comp. R. & Regs. r. 121-3-.01).
- Florida: state law creates an Electrical Contractors' Licensing Board for contractors, while counties and municipalities issue journeyman licenses, to applicants with a registered apprenticeship or at least 12,000 hours of on-the-job training. More in the Florida electrical contractors license guide.
- Arizona: the qualifying party needs four years' practical or management trade experience, and credited technical training may not exceed two years of the four.
- Iowa: a Class A master needs one year as a licensed journeyman and an exam score of 70 or higher; the license costs $375 for three years.
- Montana and Maryland: Montana requires four years of licensed journeyman experience; Maryland requires seven years under a Maryland master before the master exam, after a journeyperson exam that itself needs four years under a master.
First jobs
After the master license: getting your first jobs
A master license lets you qualify a contracting business, but it does not bring work on its own. Set your rate from real costs, start with your own Google Business Profile and website, and judge every lead source by cost per closed job rather than cost per lead.
- Set up your own channels with marketing for electricians.
- Price your work with the electrical pricing guide and the commercial electrical pricing guide.
- Check margins with the job profit margin calculator.
- Read what we look for in electrical partners on the electricians page, and every guide in Licensing.
Licensed and ready for work?
Through the Partner Program, we build and run a local brand for your trade and ZIP codes. You answer the calls and do the work. The commission is 20% of the labor on service and repair jobs, and 15% of the net on installations and replacements, with no setup fee and no monthly fee: how commission works. You do the work under your own license and insurance. We are not a contractor.
FAQ
Master electrician license questions
Is getting a master electrician license worth it?
It depends on your plans. In Texas and Iowa, an electrical contracting business needs a master, so the license is the way to run your own shop without hiring one. The BLS reports a median electrician wage of $63,190 in May 2025, with the highest 10 percent above $108,510; it does not publish pay by license level.
What is the highest electrician license?
Where a state issues one, the master license sits above the journeyman license: Texas requires a Journeyman license held at least two years before a Master license, and Iowa one year as a licensed journeyman. The contractor license is a business license, not a higher personal one. North Carolina, Georgia, Florida and Arizona license the contractor at state level instead of a master electrician.
How do I get my master electrician license?
Earn the journeyman license, log the required journeyman experience, apply to your state board with signed experience records, and pass the exam once approved. In Texas that means two years as a Journeyman, 12,000 hours of on-the-job training, a $45 application and an open-book PSI exam.
How long does it take to get a master electrician license?
It depends on the state. Texas asks for a Journeyman license held at least two years and 12,000 hours of training; Iowa one year as a licensed journeyman; Montana four years of licensed journeyman experience; Maryland seven years under a Maryland master. The journeyman stage comes first, and the BLS says most apprenticeships last 4 or 5 years.
Sources
Sources
Sources
- TDLR: Apply for a New Master Electrician License (opens in a new tab)Accessed
- TDLR: Renew a Master Electrician License (opens in a new tab)Accessed
- TDLR: Electrician Exam Information (opens in a new tab)Accessed
- TDLR: Electrician Continuing Education (opens in a new tab)Accessed
- TDLR: Apply for a New Electrical Contractor License (opens in a new tab)Accessed
- Iowa DIAL: Electrical Licensing FAQs (opens in a new tab)Accessed
- Iowa Code chapter 103 (PDF, Iowa Legislature) (opens in a new tab)Accessed
- 481 IAC chapter 401 (PDF, Iowa Legislature) (opens in a new tab)Accessed
- Montana State Electrical Board: Master Electrician (opens in a new tab)Accessed
- Maryland State Board of Electricians: License Requirements (opens in a new tab)Accessed
- NCBEEC: Licensing (opens in a new tab)Accessed
- NCBEEC: Examinations (opens in a new tab)Accessed
- NCBEEC: FAQ (opens in a new tab)Accessed
- Ga. Comp. R. & Regs. r. 121-3-.01, Statewide Electrical Contractor License (secondary source: Cornell LII copy) (opens in a new tab)Accessed
- Florida Statutes s. 489.505 (definitions) (opens in a new tab)Accessed
- Florida Statutes s. 489.507 (Electrical Contractors' Licensing Board) (opens in a new tab)Accessed
- Florida Statutes s. 489.511 (certification, experience) (opens in a new tab)Accessed
- Florida Statutes s. 489.5335 (journeyman) (opens in a new tab)Accessed
- Arizona Revised Statutes s. 32-1122 (qualifications for license) (opens in a new tab)Accessed
- BLS Occupational Outlook Handbook: Electricians (opens in a new tab)Accessed
- SBA: Launch your business (opens in a new tab)Accessed
- IRS: Get an Employer Identification Number (opens in a new tab)Accessed
Next steps
Where to go from here
Your trade
How the Partner Program works for your trade: the jobs, the licensing check and how commission is paid.
See your tradeRun your numbers
A free calculator to check the margin on a job before you price it.
Open the calculatorHow the Partner Program works
We build and run a local brand for your trade in your area. The calls ring on your phone and you pay commission only on jobs you close.
See the Partner ProgramApply to the Partner Program
Calls from your own area under a local brand. Commission only on closed jobs.
Apply
Last reviewed: