
Pricing tools
Commercial Electrical Pricing for Contractors (2026): How to Price and Bid Commercial Work
Commercial electrical work is priced from a takeoff: count every device, fixture and foot of conduit, multiply by labor hours per unit, price those hours at your loaded labor cost, then add material, overhead and margin. Labor is the base: the BLS median electrician wage was $63,190 a year in May 2025.
ByEdu López Parada· Founder, Made For BuildersReviewed
Turn your takeoff into a written estimate
Add one line per item with its quantity and the unit price you worked out below, then set sales tax, deposit and how long the estimate is valid. The generator totals the lines and lays out a proposal you can send. You can fill it in and preview it on screen; downloading the PDF asks for your email.
Add your contractor license or registration number if your state requires it.
Paste an image URL and it will appear as your logo in the header.
Sales tax varies by state and locality. Set 0% if labor or your service is not taxable.
Markup is already built into your unit prices.
Percent of the total collected up front before work begins.
Enter your email to download the PDF.
Controller: Eduardo López Parada (Made For Builders). Purpose: to send you the document and contact you about it. Legal basis: steps you ask us to take before a contract (Art. 6(1)(b) GDPR). Recipients: our service providers, some in the US with appropriate safeguards. Your rights (access, correction, deletion and more): hola@madeforbuilders.com. More in our privacy policy.
| Description | Qty | Unit price | Amount |
|---|---|---|---|
| Demo and haul-away of existing bathroom finishes | 1 | $850.00 | $850.00 |
| Porcelain tile, supply and install (sq ft) | 190 | $14.00 | $2,660.00 |
| Plumbing rough-in and fixture installation | 1 | $2,400.00 | $2,400.00 |
- This estimate is valid for the period shown above. Prices in US dollars (USD).
- Final invoice may vary if the scope of work changes or unforeseen conditions arise.
- Deposit is due before work begins; the balance is due upon completion unless agreed otherwise.
By signing below, the client approves the scope and pricing in this proposal and authorizes the work to proceed.
Document generated with the free Made For Builders tool.
Commercial electrical pricing inputs at a glance
BLS publishes what electricians are paid and what employers spend on benefits. Federal rules set prevailing wages and payment terms on federal construction. Nobody publishes a reliable price per opening, per fixture or per square foot for commercial electrical work, so those numbers have to come from your own takeoff and job history.
| Input | Figure | Source and date |
|---|---|---|
| Median wage, electricians | $63,190 a year (about $30.38 an hour at 2,080 hours) | BLS Occupational Outlook Handbook, May 2025 |
| Median wage at electrical and wiring installation contractors | $61,570 a year | BLS Occupational Outlook Handbook, May 2025 |
| Benefits share of employer compensation cost | 30.0% (private industry, all occupations) | BLS Employer Costs for Employee Compensation, June 2026 |
| Davis-Bacon coverage | Federally funded or assisted construction contracts over $2,000 | U.S. Department of Labor, read November 2026 |
| Retainage on federal fixed-price construction | Up to 10% of a payment if progress is not satisfactory | FAR 52.232-5 |
| Typical price per opening, fixture or square foot | No reliable source | Not published by BLS or any primary source we found |
How to set the price: takeoff, labor units and the formula
Price = (quantity x labor hours per unit x loaded labor cost + material) x (1 + overhead %) / (1 - target margin). Do it per line and you get a unit price for each item; add the lines and you get the bid. The labor hours per unit are your labor units.
Takeoff
Count every device, fixture, panel, feeder and foot of conduit and wire from the drawings, by type.
Labor units
Hours per unit for each item, from your own completed jobs or a published labor-unit manual adjusted to your crews. Adjust for ceiling height, access and occupied buildings.
Loaded labor cost
Wage plus payroll taxes, insurance and benefits, per productive hour on site.
Material
Current supplier quotes for the counted quantities, plus waste.
Overhead and margin
Office, estimating time, trucks, insurance and bonds as overhead, then the margin you need on the price.
Cost of labor. According to the BLS, the median annual wage for electricians was $63,190 in May 2025, and $61,570 for electricians employed by electrical contractors and other wiring installation contractors. Benefits made up 30.0% of private-industry employer compensation costs in June 2026 (BLS). The BLS also notes that electricians should expect to work overtime during scheduled maintenance or on construction sites, so price overtime where the schedule demands it.
Overhead and margin vs markup. Estimating hours, project management, bonds and insurance weigh more on commercial work than on service calls. How to work out the hourly rate, the overhead list and the margin vs markup trap is in the electrical pricing guide; this page does not repeat it.
Worked example: from takeoff to unit prices
Example only, with hypothetical labor units and round inputs: $60 of loaded labor per hour, 20% overhead and a 25% target margin turn a 40-receptacle, 24-fixture, 300-foot conduit takeoff into unit prices of $72, $224 and $8, and a bid of $10,656.
| Item | Qty | Labor hours per unit | Material per unit | Unit price | Line total |
|---|---|---|---|---|---|
| Duplex receptacle, installed | 40 | 0.5 | $15 | $72 | $2,880 |
| Light fixture, installed | 24 | 1.0 | $80 | $224 | $5,376 |
| 3/4 in. conduit, per foot | 300 | 0.05 | $2 | $8 | $2,400 |
| Total | 59 hours | $3,120 | $10,656 |
Enter each line in the estimate generator above with its quantity and unit price. Sales tax rules on materials and labor vary by state and locality; the generator lets you set the rate or leave it at 0%.
Lump-sum bid, unit prices or time and materials
A lump-sum bid fixes the price for the drawings, so your takeoff and labor units carry the risk. Unit prices fix the price per item and let quantities change. Time and materials bills actual hours and material, which fits service work and tenant changes where nobody can scope the job up front.
- Lump sum: for plan-and-spec work. Price every exclusion and every assumption in writing, because anything outside the drawings is a change order.
- Unit prices: useful when quantities are not final; the owner pays per device or per foot installed. Your unit prices must already carry overhead and margin, as in the example above.
- Time and materials: for service calls, troubleshooting and small tenant work. Your hourly rate must be a billed rate, not a wage; work it out with the calculator in the electrical pricing guide.
- Change orders: price them with the same labor units and rate as the bid, so the extra work earns the same margin.
Prevailing wage: when your labor cost is set for you
On federally funded or assisted construction contracts over $2,000, the Davis-Bacon and Related Acts require you to pay laborers and mechanics at least the locally prevailing wages and fringe benefits. Many states have their own prevailing wage laws for public work. Your estimate must use those rates, not your shop rate.
The U.S. Department of Labor states that the Davis-Bacon and Related Acts apply to contractors and subcontractors performing on federally funded or assisted contracts in excess of $2,000 for the construction, alteration or repair of public buildings or public works, and that they must pay no less than the locally prevailing wages and fringe benefits for corresponding work on similar projects in the area.
State and local public work can carry its own rules. The Department of Labor keeps a table of dollar threshold amounts for contract coverage under state prevailing wage laws; check it and your state labor agency before you bid. When a wage determination applies, price labor from the rate and fringe in that determination, then load it with your own payroll taxes and insurance. Licensing requirements for bidding commercial work are covered in electrical contractor license.

Retainage and progress payments: price the wait
Commercial jobs are usually paid in progress payments, and part of each payment may be held back as retainage until the work is accepted. On federal fixed-price construction, the contracting officer may retain up to 10% of a payment if progress is not satisfactory. Money held back is profit you have not collected yet.
Under FAR 52.232-5, the government makes progress payments monthly as the work proceeds, on estimates of work accomplished, and may retain a maximum of 10 percent of a payment until satisfactory progress is achieved. Private contracts and state public work set their own retainage terms, so read the contract.
Why retainage matters to your price
In the example above the bid earns $2,664 of profit on $10,656. If a contract held back 10% of the price until closeout, $1,065.60 would be withheld: 40% of the profit. Price the financing cost of that wait into overhead, and bill progress on time.
Building your commercial estimating system
Keep your own labor units per item, update them from every finished job and price every bid from the same sheet. Record actual hours against the estimate, line by line, so the next bid uses what your crews really took rather than what the last bid assumed.
Labor unit sheet
One row per item type with hours per unit, adjusted for height, access and occupancy.
Rate sheet
Loaded labor cost for regular time, overtime and prevailing-wage jobs.
Bid template
Scope, exclusions, assumptions, schedule, payment terms and retainage.
Job cost tracking
Actual hours and material per line, compared with the estimate at closeout.
Check the margin
Test the finished bid in the job profit margin calculator before you send it.
Commercial bids keep crews busy for weeks; residential service calls fill the gaps between them. In the Partner Program, partners get the calls from their area and pay 20% of the labor on service and repair jobs and 15% of the net on installations and replacements. Details on the commission page and the electricians page.
No setup fee, no monthly fee, no pay-per-lead. One partner per trade per area. Made For Builders is not a contractor.
Commercial electrical pricing FAQ
How do electrical contractors price commercial jobs?
From a takeoff: count every item, multiply by labor hours per unit, price those hours at the loaded labor cost, add material, overhead and margin. The result is a unit price per item and a total bid.
What is commercial electrical service?
Electrical installation, maintenance and repair in non-residential buildings such as offices, shops, restaurants and warehouses. It is usually bid from drawings or priced as time and materials for service calls, and it can fall under prevailing wage rules on public work.
How much does it cost to wire a restaurant?
No primary source publishes a reliable figure. The price comes from the takeoff: the number of circuits, devices, fixtures and equipment connections, the labor units for each and your loaded labor cost, overhead and margin.
What is retainage on a construction contract?
A share of each progress payment held back until the work is accepted or progress is satisfactory. On federal fixed-price construction, FAR 52.232-5 allows up to 10% of a payment to be retained if progress is not satisfactory.
Can you make $200,000 a year as an electrician?
Not as a typical employee: the BLS reports that the highest 10% of electricians earned more than $108,510 in May 2025. Contractor owners' earnings are not published by BLS; they depend on the margin the business earns on its jobs.
Sources and method
Wage and benefit figures come from the BLS, prevailing wage rules from the U.S. Department of Labor and retainage terms from the Federal Acquisition Regulation, all read on 10 November 2026. Labor units, material costs and prices in the example are hypothetical round inputs, labelled as such. The hourly wage equivalent and the example results are our arithmetic.
Sources
- BLS Occupational Outlook Handbook: Electricians (pay, May 2025) (opens in a new tab)Accessed
- BLS Employer Costs for Employee Compensation, June 2026 (opens in a new tab)Accessed
- U.S. Department of Labor, Wage and Hour Division: Construction (Davis-Bacon and Related Acts) (opens in a new tab)Accessed
- U.S. Department of Labor: State prevailing wage laws (opens in a new tab)Accessed
- FAR 52.232-5, Payments under Fixed-Price Construction Contracts (opens in a new tab)Accessed
Next steps
Where to go from here
Your trade
How the Partner Program works for your trade: the jobs, the licensing check and how commission is paid.
See your tradeRun your numbers
A free calculator to check the margin on a job before you price it.
Open the calculatorHow the Partner Program works
We build and run a local brand for your trade in your area. The calls ring on your phone and you pay commission only on jobs you close.
See the Partner ProgramApply to the Partner Program
Calls from your own area under a local brand. Commission only on closed jobs.
Apply
Last reviewed: